Work on the proposed construction shall begin within six months
after the date of issuance of the building permit or the permit shall
expire unless a time extension is granted, in writing, by the Building
Code Official. Construction shall be considered to have started with
the first placement of permanent construction of the site, such as
the pouring of slabs or footings or any work beyond the stage of excavation.
For a structure without a basement or poured footings, the start of
construction includes the first permanent framing or assembly of the
structure or any part thereof on its pilings or foundation, or the
affixing of any prefabricated structure or mobile home to its permanent
site. Permanent construction does not include land preparation, land
clearing, grading, filling, excavation for basement, footings, piers,
or foundations, erection of temporary forms, the installation of piling
under proposed subsurface footings, or the installation of sewer,
gas and water pipes, or electrical or other service lines from the
street.
var val = document.getElementById('citecontent').innerHTML;
art.dialog.defaults.title = window.location.href;
art.dialog.data('cite', val);
art.dialog.data('homeDemoPath', '/Scripts/plus/artDialog/');
art.dialog.open('/Scripts/plus/artDialog/citeiframe.html');