Walnutport |
Code of Ordinances |
Part II. General Legislation |
Chapter 205. Flood Damage Prevention |
Article V. Technical Provisions |
§ 205-26. Special requirements for subdivisions.
Latest version.
-
All subdivision proposals and development proposals containing at least 50 lots or at least five acres, whichever is the lesser, in identified floodplain areas where base flood elevation data are not available, shall be supported by hydrologic and hydraulic engineering analyses that determine base flood elevations and floodway information. The analyses shall be prepared by a licensed professional engineer in a format required by FEMA for a conditional letter of map revision or letter of map revision. Submittal requirements and processing fees shall be the responsibility of the applicant.