Walnutport |
Code of Ordinances |
Part II. General Legislation |
Chapter 327. Recreation and Open Space Plan |
§ 327-3. Improvements.
Latest version.
-
Improvements made to the recreation/open space areas over a five-year period (1999-2004):A.Area 1: Installation of a tennis court, basketball court, lighting and fencing; maintenance/grooming of three ballfields. including application of Loomis; erection of utility shed and batting cage; repairs and maintenance of playground equipment and surfacing; repairs and maintenance of building, pavilion, band shell and benches.B.Area 2: Installation of two foot bridges; construction of a pavilion (Phase I); improvements to picnic areas and pathways; landscaping; repairs and maintenance of Lock Tenders House, towpath and parking lots; erection of a flagpole and lighting.C.Area 3: Lot remains vacant and unused.D.Area 4: General maintenance of grounds.E.Area 5: General maintenance of grounds.