In the case of any leak, explosion or other accident in any
subsurface pipe, line, construction or apparatus, it shall be lawful
for the person owning or responsible for such pipe, line, construction
or apparatus, to commence an excavation to remedy such condition before
securing a permit, provided that application for a permit shall be
made immediately and not later than the next business day thereafter,
and that all other provisions of this article are fully complied with.
If such emergency condition shall not be immediately attended to by
the owner or person responsible for such pipe, line, construction
or apparatus, the Borough Engineer shall, after such notice as he
shall deem necessary under the circumstances of the particular case,
proceed to do the work necessary and required by such emergency, and
charge the same on the basis of cost plus 20% to such owner or person.
var val = document.getElementById('citecontent').innerHTML;
art.dialog.defaults.title = window.location.href;
art.dialog.data('cite', val);
art.dialog.data('homeDemoPath', '/Scripts/plus/artDialog/');
art.dialog.open('/Scripts/plus/artDialog/citeiframe.html');