§ 390-19. Miscellaneous.  


Latest version.
  • A. 
    All subsurface rain water conductors shall be placed in such a manner that the top of the pipe will be two inches from the top of curb with expansion joints placed vertically to the center line of pipe.
    B. 
    All utility lines affected by the work shall be raised and/or lowered to proper elevation. All legal requirements of the Commonwealth of Pennsylvania for notification to utility owners, where applicable, shall be complied with.
    C. 
    All traffic signs and street name signs removed during construction of concrete curb, sidewalk, and/or driveway entrances shall be replaced by the person, firm, corporation or other entity performing the construction.